Covered Bridge Road Repair Coming Spring 2010

The Township was recently notified by the state Department of Transportation that it would receive $250,000 to complete the reconstruction of Covered Bridge Road to the intersection of Forge Road. This heavily traveled local street is a vital piece of Cherry Hill’s 260 miles of local roadway connecting Route 70 to Kresson Road.

This will be a resurfacing and repair of Covered Bridge Road from Rt. 70 to Forge Road just before you cross the old Covered Bridge.

 Mail this post

Popularity: 32% [?]

StumbleUpon It!

Technorati Tags: , , ,

Did you enjoy this post? Why not leave a comment below and continue the conversation, or subscribe to my feed and get articles like this delivered automatically to your feed reader.

Comments

No comments yet.

Leave a comment

(required)

(required)